(Skip to contents)

search close

Water nature and people - Water will create a happier world.
HOMETechnical SupportCentrifugal Model Test and Numerical SimulationApplication

Application

  • Application for centrifugal model test
  • Request for consigned test
  • Consultation on techniques
  • Calculation of test cost and issuance of estimate
  • Conclusion of contract on consigned test
  • Centrifugal model test and analysis
  • Notification of report
  • Payment for test

Request for consigned test

Inquiry : Jung Woo Sung, a research of K-Water, +82-42-870-7601, usjung@jwater.or.kr

Types of centrifugal model test and time required

Design and production of specimen (4 days)
Test and result analysis (9 days)
Making report (7 days)
Total time required:
Dynamic test (total time required: 15 days)
Design and production of specimen (3 days)
Test and result analysis (6 days)
Making report (6 days)

※ General time required can increase or decrease depending on the importance and level of difficulty of test.