물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOME성과논문실적

논문실적

Rehabilitation of seepage monitoring system of rockfill dam for dam safety 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
Rehabilitation of seepage monitoring system of rockfill dam for dam safety
학술지명 ICOLD 저자 이종욱
발표일 2016-05-18

Sueo dam release the stored water of average 22,000m3/day into the downstream river through the outlet pipe to supply an agricultural water. The downstream water level can be controlled by the water barrage built in the downstream river. Inflow into the seepage measuring house was increased from April 2012. The V-notch weir was flooded by the increased flow rate exceeding the capacity of drainage pump. The capacity of drainage pump was 60m3/hr. If the increased flow had resulted from the flow through the core zone, the possibility of severe problem on the dam stability such as internal erosion and piping of core zone could be considered but these were not questioned because the turbidity of incoming water was almost clear with maximum 2.2 NTU (Nepthelometric Turbidity Unit). Another cause could be expected was the inflow of the downstream river water through the seepage collecting system. In this study, correlations among the measured seepage flow rate, the reservoir water level and the released water supply rate for agricultural are analysed and the temperature, turbidity and pH of the inflow water also measured and analysed to investigate the possibility of inflow of the river water. CCTV (closed circuit television) surveys and field investigations for the collecting pipe and seepage collecting wall and the foundation of it were carried out to find out inflow path of the river water. It was confirmed that the possibility of inflow of the river water through the damaged collecting pipe and the foundation under the collecting wall. Repair and Rehabilitation work for the damaged collecting pipe and the foundation under the collecting wall, had possibility of inflow of the river water, was started on Mar. 2013, and completed in Jun. 2013.

목록