물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOME성과논문실적

논문실적

Build a Turbine Test Facility and its Role in the Hydropower Industry 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
Build a Turbine Test Facility and its Role in the Hydropower Industry
학술지명 Hydro2014 저자 오용환,탁세완,조용,김경성
발표일 2014-10-14

In recent ten years, small hydropower plants which are located along the four major rivers and the biggest sea tidal power plant had been constructed in South Korea. In spite of hydropower construction boom, it was difficult to find Korean made turbines during the same period. Korea Water Resources Corporation(K-water, public company) which operates 1,324MW hydropower plants including Siwha Sea Tidal Plant is preparing to rehabilitate hydro turbine facilities operated over forty years. A model turbine performance test facility was built at K-water for supporting small companies in Korea to develop their technical abilities in 2013. K-water succeeded in testing a model bulb type turbine and drew performance curves. The test result has the uncertainty of 0.8%. Despite K-water tried to build it as IEC standards, the uncertainty of test result was not satisfied with national standards. A torque measurement system of model turbine and a dynamometer are needed to supplement. K-water will enhance the test facility and use it for promoting domestic turbine manufacturers with real hydro turbine sites of K-water’s.

목록