물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOME성과논문실적

논문실적

3-Dimensional Hydrodynamic Simulation of Reservoir Sedimentation and Flushing Operation 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
3-Dimensional Hydrodynamic Simulation of Reservoir Sedimentation and Flushing Operation
학술지명 IT'L SYMPOSIUM ON RIVER AND LAKE ENVIRONMT 저자 이경수,박원철,허영택,노준우
발표일 2014-11-06

Patrind hydropower project is to generate electricity and provide for residence of the Patrind village. 120Km
apart from Islamabad, the project site is located in northeastern part of Pakistan. The main components of this project include reservoir, sand trap, and turbine systems. For the purpose of the water storage a diversion weir is to be constructed across the Kunhar River near the start of the narrow gorge close to the Patrind village and the powerhouse placed in the Jhelum River is expected to generate up to 150MW electricity in each year. First, the Run of River (ROR) type reservoir will be constructed in the Kunhar River for the purpose of water storage. The Kunhar River is major tributary of the Jehlum River and the difference of the water surface elevation between these two rivers is 80m connected by the headrace tunnel which provides good opportunity for hydropower generation. The major component of the project is composed of diversion weir, sand trap, and the turbine system necessary for hydropower generation. Since it is subject to excessive sediment especially during monsoon season, a proper sediment management scheme is necessary. To minimize successive sedimentation in the reservoir sediment flushing is proposed based on the flushing gate operation. This paper presents long-term sedimentation in the reservoir and evaluates the efficiency of sediment flushing using EFDC 3-dimensinal hydrodynamic. Total simulation period was 5 years assuming sediment flushing was done for 5 days in each year after the maximum discharge. Applying averaged inflow as boundary condition of the upstream the analysis focuses on the concentration and deposited particle in front of the sand trap which exceeds 0.02mm since it is known to damage turbine system significantly.

목록