직결-수직형 정수처리플랜트에서 전력사용량 분석에 관한 연구 |
---|
학술지명 한국수처리학회
저자 서인석,채선하,김정현,김성수
발표일 2014-08-29
|
In this research, direct coupled pressurized WTP(Water Treatment Plant) of multi stories structure(1,000 ㎥/day) was constructed and operated. WTP consisted of membrane filtration(UF), ozone, granular activated carbon(GAC) and UV disinfection. All equipment was grouped as a unit process to measure electricity consumption. As a results of electricity consumption analysis, intake and supply pump consume great part of electricity(34.51%), total electricity consumption of plant operation except for intake and supply pump was 0.36~0.41 kWh/㎥. Electricity consumption for UF, O3, GAC, UV and operating facility(computer server, monitoring and control system) were approximately 0.2, 0.144, 0.013 and 0.029, 0.066 kWh/㎥, respectively. All differential pressure result from direct coupled plant configuration loaded to UF feed pump, therefore UF feed pump is a most important equipment in aspect of energy saving. |