물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOME성과논문실적

논문실적

Establishing performance test system and technical criteria for a small hydropower 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
Establishing performance test system and technical criteria for a small hydropower
학술지명 International green energy business conference 2011 저자 조용,김영준
발표일 2011-04-08

Domestic hydroelectric power plants has been manufactured as the design condition by the demand. Hydraulic turbine power plants operating at appointed load shall be operate stable in terms of pressure, discharge, rotational speed and torque. A performance guarantees for hydro turbines shall be contain, as a minimum, guarantees covering power, discharge and specific hydraulic energy, efficiency, maximum momentary overspeed and maximum momentary pressure and maximum steady-state runaway speed, as well as guarantees related to cavitation. 
 But, present in Korea, the absence of testing laboratories and technical criteria for the performance test of small hydropower degrades the efficiency of the domestic hydropower machines, and makes it difficult to objectively evaluate the performance of hydro turbine. 
Therefore We planned making a basis of performance test of small hydropower turbine by using our flowmeter calibration system the largest one in Korea.  We planned the maximum measurable power of hydro turbine will be 200kW in our system.

목록