물 자연 그리고 사람 - 물로 더 행복한 세상을 만들어가겠습니다.
HOME성과논문실적

논문실적

A Case Study for Enhancing the Pollutant Removal Efficiency in a Surface Flow Constructed Wetland, the Sihwa Constructed Wetland, Korea 게시글의 제목, 학술지명, 저자, 발행일, 작성내용을 보여줌
A Case Study for Enhancing the Pollutant Removal Efficiency in a Surface Flow Constructed Wetland, the Sihwa Constructed Wetland, Korea
학술지명 JOURNAL OF ECOTECHNOLOGY RESEARCH 저자 최광순,김세원,김동섭
발표일 2007-10-06

To improve the pollutant removal efficiency of a surface flow constructed wetland, the Sihwa Constructed Wetland, in Korea, we established various improvement plans enhancing the ability of water purification of the wetland by clarifying the major causes on a decrease of water purification ability of the wetland were. The removal efficiency of BOD, TN and TP in the wetland was varied with season and pollutants, showing the mean removal efficiency of 61.8%(-26.7~90.0%) for SS, 12.3%(-50.1~61.6%) for BOD, 38.6%(-13.2~70.4%) for TN, and -32.5%(-291.2~84.9%) for TP. Generally, the efficiency was low in summer season, except for TN. The efficiency for BOD and TP went to negative values with rising the water temperature of wetland. In this study we applied three plans (water level control, improvement of water flow, and control the fish causing resuspension solids) and pre-tested one plan (effect analysis for coagulants reducing phosphorus release from sediment). After application of the improvement of water flow and the control of fish biomass were very effective to improve the removal efficiency of solids and organic matter in short period. It was found that the excellent coagulant was Mg(OH)2 showing 70% removal efficiency of phosphorus. To improve the removal efficiency of constructed wetland, it may need to be considered to apply the coagulant such as Mg(OH)2 which have high adsorption capabilities for phosphorus because the removal efficiency of phosphorus is generally low in constructed wetland.

목록