| Development of Control Point Management Module based upon GIS |
|---|
|
학술지명 ICCC2014
저자 임광섭,정석재
발표일 2014-06-27
|
|
The control point surveying result is not only the most basic data but also one of the most important data forreliable water resources survey of experimental catchment management.Also the accurate location of facilities around dam is essential requirement for guarantee of dam operation.Although bench marks are established beside the road, most of bench marks were lost during dam construction in case of Yongdam Dam. There is only one milestone left on measuring water surface elevation, butrests are over 20km away from the dam. |
